Our projects

Reduction of Power Consumption and Waste Disposal at “Obolon” PJSC

The main goal of this Joint Implementation project is the implementation of the integrated programme of technical and technological modernization of the company, adoption of the disposal system for organic waste of brewing, which includes both technical and organizational measures.

Years of implementation: 2004-2025

Project type: energy demand, waste handling and disposal

Amount of AAUs: 1 082 815 t СО 2 е

Amount of ERUs for 2008-2012: 1 685 837 t СО 2 е

Amount of ERUs for 2013-2025: 4 060 306 t СО 2 е

Documentation:

More information

Implementation of Complex Technical and Technological Modernization of Enterprise to Reduce Energy Consumption and Implementation of Recycling Organic Waste from Beer Production at DE PJSC "Obolon" "Zibert’s Brewery"

The main goal of this JI project is the reduction of greenhouse gas emissions through implementation of the integrated programme of technical and technological modernization of the enterprise, adoption of the disposal system for organic waste of brewing.

The adoption of actions provided by the project will allow to improve energy efficiency of the brewing process, reduce the amount of organic waste and assure environmentally-friendly disposal of organic waste produced during the process. At the same time this will lead to the reduction of power consumed for beer production, will allow to give up removal of organic waste to landfills and, as a result, will reduce emission of greenhouse gases related to the production process.

Years of implementation: 2008-2025

Project type: energy demand, waste handling and disposal

Amount of ERUs for 2008-2012: 328 576 t СО 2 е

Amount of ERUs for 2013-2025: 1 117 402 t СО 2 е

Documentation:

More information

Conduction of the Complex Technical and Technological Modernization of an Enterprise which is Aimed at the Reduction of Energy Consumption and the Implementation of the Utilization System of Organic Waste from Sugar Production on PJSC "Rise-Maksymko"

The main goal of this JI project is the implementation of the programme of complex technical and technological modernization of four sugar plants exploited by PJSC «Rise-Maksymko», implementation of measures that lead to reduction of limestone decomposition necessity by improvement of juice purity and implementation of measures that lead to elimination of necessity of pulp transportation to landfills due to adaptation of pulp pressing, drying and granulating systems.

Years of implementation: 2004-2025

Project type: energy demand, waste handling and disposal

Amount of AAUs: 2 364 233 t СО2е

Amount of ERUs for 2008-2012: 4 740 548 t СО2е

Amount of ERUs for 2013-2025: 14 071 057 t СО2е

Documentation:

More information

Implementation of technological modernization of LLC “TH “Shepetivsky Sugar”

The main goal of this JI project is to achieve greenhouse gases emission reductions through decreasing specific natural gas and electricity consumption during sugar production, and advancing waste management practices at LLC “TH “Shepetivsky Sugar”.

As a result of the project implementation energy consumption of the enterprise is reduced, which is related to greenhouse gases emissions, and the quantity of the beetroot pulp decreases, which would be moved to landfill, where as a resultant of anaerobic fermentation of the organic matter contained in the beetroot pulp methane would be released, which is a greenhouse gas.

Years of implementation: 2005-2029

Project type: energy demand, waste handling and disposal

Amount of AAUs: 231 133 t СО 2 е

Amount of ERUs for 2008-2012: 1 323 440 t СО 2 е

Amount of ERUs for 2013-2029: 5 762 085 t СО 2 е

Documentation:

More information

Implementation of energy efficiency measures in enterprises of «Agrarian Holding Avangard»

The main goal of this JI project is to achieve the greenhouse gas emissions reduction by decreasing specific energy consumption at enterprises of “Agrarian Holding Avangard” and improvement of production waste management practice (chicken manure).

Years of implementation: 2008-2020

Project type: energy demand, waste handling and disposal

Amount of ERUs for 2008-2012: 5 886 550 t СО2е

Amount of ERUs for 2013-2020: 12 602 344 t СО2е

Documentation:

More information

Implementation of technological modernization of installations with the aim of the introduction of sugar production organic waste management system for the sugar factories participating in the joint activities

The main goal of this JI project is to achieve greenhouse gases emission reductions through improving and modernizing the practice of recycling of organic waste at sugar plants, included in the project boundaries. The project activity results in decrease of the amount of sugar beet pulp to be disposed in landfills, where due to decomposition of organic matter in the pulp under anaerobic conditions the methane is released, which is a greenhouse gas.

Years of implementation: 2005-2029

Project type: waste recycling and utilization

Amount of AAUs: 1 450 050 t СО 2 е

Amount of ERUs for 2008-2012: 5 246 951 t СО 2 е

Amount of ERUs for 2013-2029: 41 146 271 t СО 2 е

Documentation:

More information

Implementation of technological modernization of PJSC “Gorokhiv Sugar Mill”

The main goal of this JI project is to decrease greenhouse gas emissions through improving and modernizing the practice of recycling of organic waste at PJSC “Gorokhiv Sugar Mill”. The project activity results in decrease of the amount of sugar beet pulp to be disposed in landfills, where due to decomposition of organic matter in the pulp under anaerobic conditions the methane releases, which is a greenhouse gas.

Years of implementation: 2008-2027

Project type: waste recycling and utilization

Amount of ERUs for 2008-2012: 1 630 229 t СО 2 е

Amount of ERUs for 2013-2027: 6 858 591 t СО 2 е

Documentation:

More information

Technological modernization aimed at utilization of sugar production organic waste at the ALC “Palmirsky sugar plant”

The main goal of this JI project is to achieve greenhouse gases emission reductions through improving and modernizing the practice of recycling of organic waste at sugar plants, included in the project boundaries. The project activity results in decrease of the amount of sugar beet pulp to be disposed in landfills, where due to decomposition of organic matter in the pulp under anaerobic conditions the methane releases, which is a greenhouse gas.

Years of implementation: 2008-2027

Project type: waste recycling and utilization

Amount of ERUs for 2008-2012: 8 880 152 t СО 2 е

Amount of ERUs for 2013-2027: 35 148 961 t СО 2 е

Documentation:

More information

Introduction of sugar production organic waste management system at the “Podilski sugar mills” LTD

The main goal of this JI project is to achieve greenhouse gases emission reductions through improving and modernizing the practice of recycling of organic waste at sugar plants, included in the project boundaries. The project activity results in decrease of the amount of sugar beet pulp to be disposed in landfills, where due to decomposition of organic matter in the pulp under anaerobic conditions the methane releases, which is a greenhouse gas.

Years of implementation: 2008-2026

Project type: waste recycling and utilization

Amount of ERUs for 2008-2012: 2 150 948 t СО2е

Amount of ERUs for 2013-2026: 10 335 220 t СО2е

Documentation:

More information

Implementation of complex of energy efficiency measures and waste disposal at PJSC “SUN INBEV UKRAINE”

The main goal of this JI project is to achieve greenhouse gases emission reductions through modernization of production, which will reduce costs of electricity and heat in the beer production, and introduction of the system of disposal of wastes from production (spent grains) which will allow to avoid methane emissions, formed through disposal of production waste at landfills.

Years of implementation: 2004-2025

Project type: energy industries (renewable - / non-renewable sources) and waste handling and disposal

Amount of AAUs: 598 668 t СО2е

Amount of ERUs for 2008-2012: 1 060 436 t СО2е

Amount of ERUs for 2013-2025: 2 851 355 t СО2е

Documentation:

Our Contacts

1 Panasa Myrnoho St., Office 2, Kyiv 01011, Ukraine. Tel.: +38 (044) 280-23-50, 227-66-86   Fax:+38 (044) 280-23-46.